You sent a clean STEP file, the geometry is watertight, and the reply came back asking for a drawing. It reads like bureaucracy — the shop already has the shape, in three dimensions, to six decimal places. A 3D printing shop asking for a 2D drawing is not asking for the shape. It is asking which parts of that shape are allowed to move, because the model does not say, and somebody has to decide before the part is made rather than after it arrives. If you are still choosing who to send the package to, browse the 3D printing provider directory and check what each shop says about inspection and tolerances first.
The Model Says What. The Drawing Says Which Features Matter.
A solid model is a statement of nominal geometry. Every dimension in it is exact and every dimension in it is equally exact, which is the problem: the 12.00 mm bore that has to accept a bearing and the 80.00 mm overall length that nobody will ever measure look identical in the file.
No process prints to nominal. Parts come off a machine somewhere inside a range, and the shop's job is to decide which range. Given only a model, it has two choices, and both cost you something:
- Apply the house general tolerance to everything. Cheapest to quote, and the bearing bore comes back at whatever the process happened to give it.
- Treat the whole part as critical. Tighter orientation, slower settings, an inspection step, possibly machining after printing — and a quote that may be double what the part needed.
A drawing collapses that choice. Two toleranced features and a note saying the rest is nominal tells the shop exactly where to spend money and where not to.
| Carried by the 3D model | Carried only by the drawing |
|---|---|
| Nominal shape and size | Which dimensions are critical, and their limits |
| Feature positions relative to each other | The datum everything is measured from |
| A hole's diameter and depth | Whether that hole is tapped, reamed or takes a heat-set insert |
| Surface geometry | Which face is cosmetic and which may carry support marks |
| Units, if the format declares them | Material by grade, finish level, quantity |
| The current state of the file | Part number and revision — what you are reordering |
Read the right column as a list of decisions. Every one of them gets made whether or not you make it. The only question is whether you make it, or a scheduler you have never spoken to makes it at 7am to keep a machine loaded.
The Five Things a Drawing Settles
1. Where to measure from. "The hole is 0.3 mm out" is meaningless until you both agree what it is 0.3 mm out from. A datum — a face, an edge, a bore axis — turns a vague complaint into a measurement either party can repeat. This single callout resolves more disputes than tolerance values do, because most "wrong" parts are correct from one origin and wrong from another.
2. What has to fit, and how tightly. Commonly published bureau tolerances run around ±0.5% with a floor near ±0.5 mm for FDM, and roughly ±0.2% with a floor near ±0.1–0.2 mm for resin-based processes; the specifics vary by shop, machine and material, which is exactly why they are published per-shop. Our breakdown of tolerances and accuracy in 3D printing covers what each process genuinely holds. Your drawing's job is narrower: name the two or three features that must land, and let the shop apply its general tolerance to the rest.
3. What happens to the holes. A 5 mm hole in the model might need to come out as a tapped M6, a reamed bore, or a pocket for a heat-set insert. Those are three different operations and three different as-printed diameters. The model shows one cylinder for all three.
4. Which face the customer sees. Every part has an orientation that is cheapest to print and an orientation that puts the support witness marks somewhere you do not mind. Mark the cosmetic face and the shop will plan around it. Leave it unmarked and the scar lands where the slicer put it, which is usually the largest flat surface — the one you were going to photograph.
5. Which version this is. A part number and a revision letter in the title block is what makes a second order match the first. Filenames do not do this; the reasons a reorder comes back different from the first batch are mostly reasons nobody could prove which revision was approved.
